Reference

Plug-and-play water treatment (WTP-F) for power plant


SILHORKO-EUROWATER has supplied a water treatment plant for the 40 MW Tilbury Green Power Waste Wood Biomass Plant which is powered by approx. 285,000 tonnes of waste wood each year. The power plant is constructed and operated by a consortium led by BWSC and with AET as consortium partner.

The water treatment plant is complete with all internal piping and wiring factory-built. The whole plant has been performance tested and pressure tested in our factory and is ready for use. Factory Acceptance Testing (FAT) has been performed by the power plant specialist BWSC. Commissioning on site was done in 2 days. A true plug and play solution.
The steam blow, an important milestone in the project, was accomplished as planned.
 

Reference ID: 113075
Industry: Távfűtő- és erőművek
Application: Kazánvíz

 

Generate PDF

Technical data

  • Flow rate: 5 m³/h
  • Conductivity: < 0.1 µS/cm
  • Silica (SiO2): < 20 ppb

Units in plant

  • Water Treatment Plant frame-mounted
  • Brine maker tank 3500 l
  • Break water tank 2000 l
  • Collection tank 2000 l
  • Pump unit
  • Brine collection pump unit

 